Getting the measurements wrong before a cubicle order is one of the most expensive mistakes in an office fit-out. Panels that don't fit, layouts that block fire exits, or workstations that can't accommodate the specified furniture — all of these are avoidable with proper measurement. Here's the complete checklist.
You don't need professional surveying equipment, but you do need accurate tools. A laser distance measurer (available for ₱1,500–₱3,000) is significantly more accurate than a tape measure for large spaces and is worth the investment. You'll also need graph paper or a floor plan app (we recommend using a simple grid in Google Slides or PowerPoint), a notepad, and a camera for documentation.
Start with the overall room dimensions: length and width at multiple points. Rooms are rarely perfectly rectangular — measure at both ends of each wall and note any discrepancies. Record ceiling height as well — this affects panel height selection and HVAC considerations.
Fixed obstacles are elements that cannot be moved and must be worked around in the layout. Document the exact position and dimensions of each:
Power outlet and data port positions are critical for cubicle layout — workstations need to be positioned within reach of power and data, or cable management needs to be planned to bridge the gap. Document:
Philippine building codes and fire safety regulations require minimum walkway widths. Primary walkways (main circulation paths) should be at least 120cm wide. Secondary walkways (between cubicle rows) should be at least 90cm wide. Emergency egress paths must be at least 120cm wide and must lead directly to fire exits without obstruction. Measure your planned walkway widths against these minimums before finalizing the layout.
With all measurements documented, create a scaled floor plan on graph paper or in a digital tool. Use a scale of 1:50 (1cm = 50cm) for most office spaces. Draw the room outline, mark all fixed obstacles, and mark power and data locations. Then sketch in your proposed cubicle layout, checking that all walkway clearances are maintained. Share this plan with your furniture supplier before placing the order — GreatWorks provides free layout review for all orders.
These are the most common measurement errors that cause problems on installation day:
Free Consultation
Tell us your team size, space, and furniture needs. We'll help you plan a practical workspace before you commit to the furniture.